ORBIT · Constraint-gated framework · Conceptual procedure

ORBIT Decision Gate

When should a warning signal lead to monitoring, targeted inquiry or corrective action? The procedure below follows Figure 1 and Sections 3.9–3.11 of the paper. Enter figures or load an illustrative case.

Revisit as new evidence arrives
Illustrative cases (invented values):
STEP 1

Screen

Is something unusual?
S(f,t) = Σ wpqp / Σ wp, over observed conditions pSection 3.9
Screening score
–
REFERRAL RULE · S ≥ ⅔–

The score is the share of observed warnings. It shows that warnings occur together. It does not show the cause or how serious the problem is. A score is given only when at least four of the six domains are observable. A firm is referred to the decision gate when S ≥ ⅔: 4 of 6, 4 of 5 or 3 of 4 observed domains. A referral below this threshold requires a documented, specific obligation and is recorded separately.

STEP 2

Decision gate

Is something important at risk, and by when?
Hr(τ,ω) = Ur(τ,ω) − Rr(τ,ω)Eq. (1)
Discrepancies that reduce usable cash before the due date
TIMING
ViewHeadroomStatus

Headroom = usable resources − requirement, at the due date. A resource counts only if it is usable before the due date. Money and physical capacity are never added together. The adverse case reduces the operating inflows still expected by 20%. Checking each discrepancy one at a time can miss a shortfall that appears when they are counted together.

STEP 3

Response

Monitor, targeted inquiry, or act: which costs least?
PROTOCOL RULE · TABLE 3–

Monitor: headroom positive in the base and adverse case. Targeted inquiry: positive in the base case but negative in the adverse case, or evidence incomplete. Compare interventions: negative in the base case with a material consequence. The comparison below shows the expected-loss view.

Compare responses by expected loss: M, A or QiSection 3.10 · Eqs. (2)–(4)